MOCpages : Share your LEGO® creations
LEGO models my own creation MOCpages toys shop 21st Century WorldMilitary
Welcome to the world's greatest LEGO fan community!
Explore cool creations, share your own, and have lots of fun together.  ~  It's all free!
Conversation »
Current Projects
 Group admin 
Here is a place to list your current projects and give ETAs for them. This way we know when your nation has actually been producing something new.
Permalink
| September 19, 2010, 6:19 pm
 Group admin 
For example:


UNO: current projects:

Joint submarine program with India, working on advanced nuclear attack/ballistic missile submarine, 60% - prototype completed, refinements and developments with India still ongoing.

variopus artillery, 100% - awaits posting.

New Front line transport vehicle, 0%

Field car LFC-1, 0%
Permalink
| September 19, 2010, 6:23 pm
 Group moderator 
Finland
In-group projects
F-35P (International project) 95%: Prototype form
ETA:1 week

Solar plants 75%-
ETA-2 weeks

Geothermal plants 95%
ETA- 3 Days

Comprehensive Air/Ground Border Defense System
80%
ETA- 2 1/2 weeks

MOCs
Unnamed IFV- 65%
ETA 2 weeks

Type 1 Class Cruiser- Planning Stages Approx 3% of design built, 50% design finalized
ETA- within one week

APC- 5%
ETA TBD
Permalink
| September 19, 2010, 6:50 pm
Algeria
advanced artillery
ETA eventually...hopefully anyways.

MOCs
artillery
trailers for my Alger vehicle
Permalink
| September 19, 2010, 6:55 pm
 Group moderator 
Secret Project Research: 86% (as Ham found out the hard way, still is; indefinite)

AESA Radar: 100% (Operational)

Arakas tactical-missile defense system: 45% (two months)

Three oil rigs (civilian): 100%

Naval base sites (Andaman and Nicobar Islands): 45% (Three months)

KIRI-radar (AEGIS): 100% (Installation in progress)
Permalink
| September 19, 2010, 11:50 pm
Solar Energy farm in production in the Gobi Deseert 20%
Permalink
| September 19, 2010, 11:55 pm
 Group admin 
Refinement of the Murus Wall Defenses to meet the Standard of the Emperor

-20%

-ETA: Post-poned

Super Secret Project with the Roman Empire

-50%

-ETA: 5 Months
Permalink
| September 20, 2010, 12:03 am
 Group moderator 
Generic Heavy Supply Truck: 90%. I know exactly how the last 10% will go, it's just that I can't be bothered lately to finish, photograph and post it. And when I can be bothered, I've got a bellyache. I'll get around to it sooner or later.

Anyway, I'm already using it, technically. It's just a transport truck, so yeah, not likely to affect the outcome of a battle.
Permalink
| September 20, 2010, 3:20 am
UMN project status
- Heavy tank= canceled
- All-terrain quatropedal tank = canceled
- Multi-task VTOL aircraft = 30% completed
- Fleet carrier = 20% completed
Permalink
| September 20, 2010, 4:53 am
 Group moderator 
Quoting Sour Cream
- All-terrain quatropedal tank = canceled

'Ullo 'ullo 'ullo, what's all this then?
Permalink
| September 20, 2010, 5:15 am
If you mean its impossible:
This is possible by combining some hydraulics piston for the joints and a srew-shaped tracks for the tracks that pull the whole tank on the ground. An actual (lego) protoype already made, but the shape of the whole tank doesnt suit me so i dispose of it
Permalink
| September 20, 2010, 6:08 am
 Group moderator 
I'm just saying, people get yelled at for far more realistic things.
Permalink
| September 20, 2010, 6:15 am
Quoting Areetsa C
I'm just saying, people get yelled at for far more realistic things.

Well, im not that "type"of person.
Permalink
| September 20, 2010, 6:20 am
 Group moderator 
Great Lakes Class super carrier: 85% at the north one, 79% at the one at Newport news due to war.

ETA: Within a week.

Remembrance class battleship: 58%

ETA: Several weeks.
Permalink
| September 20, 2010, 7:05 am
 Group admin 
Hmm...

-Tank for Areetsa
-Tank for John Dawn
-Helicopter for me
-Boats for me

Yup.
Permalink
| September 20, 2010, 8:17 am
 Group admin 
Oceania:

Await posting: ETA=as soon as I can get decent pics.

Nuclear Submarine final - 95%
AR-60b - 100%
various artillery - 100%
MMB-1/MAAP-1 - 100%
various infantry figs and infantry toys. -90ish%

unfinished: ETA=?

LFC-1 Field car - 0%
New front line equipment transport - 0%
Permalink
| September 21, 2010, 11:45 pm
 Group moderator 
Quoting Ultramarine .
Space program: 55% (ISA; three months)

Secret Project Research: 70% (as Ham found out the hard way, still is; indefinite)

Aetha Radar: 90% (Operational prototypes; one month)

Arakas tactical-missile defense system: 45% (two months)

Three oil rigs (civilian): 89% (within the month)

Naval base sites (Andaman and Nicobar Islands): 5% (Three months)

Indian/Oceanian JSF-1 Air Superiority fighter: 15% (three months game, two weeks for me finding the pieces)

Medium bomber: 10% (three months)
Permalink
| September 23, 2010, 11:25 am
 Group moderator 
My only current project is a 1/4 scale flying wing heavy bomber, which is only about 25% done. GAC's first prototype has made it's initial flight, and several technological upgrades are required before the beast is ready for combat. I'm aiming for a ~200 foot wingspanned flying wing with the payload equal or greater than that of a B-2, with less maintenence and higher-powered engines and lower radar cross section. The exaust will be re-designed to counter more advanced IR scanners, and the S-bend has been built to an extreme, making the fan blades 100% impossible to spot on radar. The thin flying wing design allows the bomber to slice through the air with minimal turbulence, and the muffled engines are quiet enough that at altitude, the bomber cannot be heard from the ground. A large radar mounted beneath the nose enables the bomber to scan the ground and pinpoint targets with ease and deadly accuracy.
Permalink
| September 23, 2010, 1:01 pm
 Group admin 
Quoting Ultramarine .
Indian/Oceanian JSF-1 Air Superiority fighter: 15% (three months game, two weeks for me finding the pieces)

Speaking of which, I hope you don't mind, but the ones built in my factories, I'd like to dub the AR-15a, in compliance with the Oceanian standard naming structure.
Permalink
| September 23, 2010, 7:32 pm
 Group moderator 
Quoting Thomas N
Speaking of which, I hope you don't mind, but the ones built in my factories, I'd like to dub the AR-15a, in compliance with the Oceanian standard naming structure.

I was planning on renaming them too. It would be horribly confusing to have 2 F-1s. Mine will be the F-2.
Permalink
| September 23, 2010, 10:03 pm
 Group admin 
Due to the realization of the need for more Marine support ships, new plans for the Navy are going into effect.

12 of the previous 42 Stealth Cruisers will be outfitted and changed to be Stealth LPDs, with the capacity to carry two LCAC in the rear.

In addition, the four Wellingotn Class Escort Carriers will be outfitted and upgraded to Amphibious Landing Carriers. They will be outfitted with 20 AMF-O 66s, aquired from Malaysia, and also come with many flights of helicopters.

These two new classes of amphibious landing ships should bring greatness to the Oceanian Marines.
Permalink
| September 26, 2010, 11:18 am
Stug XII updates engine block complete
Permalink
| October 9, 2010, 12:25 pm
Other topics
student teen kid toy play lego child video game hobby blocks construction toy legos fun games



LEGO models my own creation MOCpages toys shop 21st Century WorldMilitary


You Your home page | LEGO creations | Favorite builders
Activity Activity | Comments | Creations
Explore Explore | Recent | Groups
MOCpages is an unofficial, fan-created website. LEGO® and the brick configuration are property of The LEGO Group, which does not sponsor, own, or endorse this site.
©2002-2014 Sean Kenney Design Inc | Privacy policy | Terms of use